For home ★ Join collectio Chinese English
Home News About us Installation branch Pressure testing branch Lining repairing branch Crossing department International branch Inland branch Department Customer opinion
News
Corporate Culture
Engineering Information
Notice
Career Center
 
You now:Home > English > News > Corporate Culture
Job training、Maintenance of equipment、to make good preparation work for the project
 
After the Spring Festival,each branch did their best to make good preparation work for the starting of the 2012 construction projects in accordance with the requirements of the corporation . They were organized the project manager, team leader and staff to have activities for skills, management knowledge training and job training activities in eight sessions. The also made a check and maintenance on construction equipment and machinery. Altogether they maintained about 30 units (sets),such as the air compressors , generators , charging pump and the tractor , and other 20 sets of spray equipment . These preparation works laid a solid security foundation for the smooth start of the project.
The lining repairing branch combined with the actual situation,they made pointed  organization staff on stainless steel welding training, strengthen staff team management。These efforts made the staff on an entirely new look
 The pressure testing branch is to aim at large air compressors, drying equipment , high utilization , frequent transitions of the characteristics and the branch leadership attaches great importance,the equipment administrator is responsible earnestly,so the large-scale equipment is scheduled to set the machine , listing the person responsible for the system to reach 100% .
, arrange work in the morning

Previous: Role Model
Next: Congratulations to our corporation!

  
About us /  Customer service / Contact us Copyright © 2010 Henan ZhongTuo Petroleum Engineering Technology Co.,Ltd All rights reserved
豫ICP备05002509号